CLIENT: OSCAR RENDA CONTRACTING
WORK COMPLETION: ONGOING
TOTAL CONSTRUCTION COST: $116 M

This three-year contract represents the bulk of the city's $355 million Restore Biloxi Infrastructure Repair Program. This project is a significant water, sewer, and storm drain improvement project. The North Contract takes place mainly in areas north of the CSX railway from Forrest Avenue to the tip of Point Cadet. The project includes the replacement of the water mains, sanitary sewer lines, and storm drains as well as the streets, curbs, and sidewalks impacted by the construction work. The project also includes eight pump stations that will be eliminated, a new pump station that will be constructed, and one pump station that will be rehabilitated. 

TEI was selected by Oscar Renda Contracting to provide professional surveying services for the City of Biloxi's "North Contract." Project scope of work includes:

  • Construction staking for the entire project and finalize completed "As-Built" Record Drawings
  • Outfall structure sediment evaluation -
    • includes periodic surveying of stormwater runoff sediment entering the waters of the state to assist the contractor with Mississippi Department of Environmental Quality (MDEQ) stormwater compliance
  • Staking items:
    • curbs and gutters
    • fire hydrants
    • drainage structures
    • sidewalks
    • fencing

 

*Information provided by the City of Biloxi - Biloxi City Council at www.biloxi.ms.us