CLIENT: FLORIDA GAS TRANSMISSION
WORK COMPLETION: 2014
TOTAL CONSTRUCTION COST: N/A

TEI was selected to perform the following tasks:

• Obtain all necessary information from Florida Gas Transmission that pertains to the proposed project.
• Provide final As-Built Plans created with CADD software for the Oil/Water Separator constructed location.
• Provide final As-Built Plans created with CADD software for the Cooling Tower constructed location.
• Review plans and submit to Florida Gas Transmission for review.
• Address any corrections and provide an electronic hard copy of final plans.