2018
WATER SYSTEM IMPROVEMENTS
CLIENT: CITY OF WIGGINS

Tice Engineering was hired by the City of Wiggins to plan, design and oversee construction of city-wide water system improvements. The project kicked-off with the development and approval of a water facilities plan. Once the facility plan was approved, the City was awarded a State Revolving Loan and TEI moved into the design phase. The design includes the rehabilitation of an existing tank, the establishment of a new 1,000 GPM well, closure of an existing well and the design of new water lines to replace undersized lines or to create loops in the system. The project required coordination with the regulatory agencies during design which will continue through construction.

SCOPE OF WORK INCLUDED:
Preparation of a facilities plan, including public hearing and approval
Survey of existing infrastructure
Prepared design drawings for proposed improvements
Bidding services for water system improvements
Construction administration
Construction inspection

Next
Next

Drainage Improvements (East Border Avenue, Cavers Avenue, Library, & Clubhouse Drive)