2019
McGREGOR STREET DRAINAGE
CLIENT: CITY OF WIGGINS

Tice Engineering was hired by the City of Wiggins to oversee the McGregor Drainage Improvements. This was an emergency repair project which consisted of the removal and replacement of approximately 50’ of deteriorating corrugated metal pipe with concrete arch pipe. The roadway was closed due to a severe storm which undermined this portion of McGregor Street until emergency repairs could be made. The project included securing grant funding from the Pat Harrison Waterway District.

SCOPE OF WORK INCLUDED:
Survey
Design
Securing grant funding from Pat Harrison Waterway District
Construction Oversight

Previous
Previous

West Bond Drainage

Next
Next

Biloxi VAMC Repair Architectural Deficiencies