Tice Engineering was hired by the City of Wiggins to oversee the West Bond Drainage Improvements. The project consisted of removal and replacement of 60’ of deteriorating corrugated metal pipe with concrete arch pipe. The project included securing grant funding from the Pat Harrison Waterway District. The constructed improvements reduced flooding of upstream residential areas and prevented future undermining of the roadway.

SCOPE OF WORK INCLUDED:
Survey
Design
Securing grant funding from Pat Harrison Waterway District
Construction Oversight