2017
EMERGENCY REPAIR VINE STREET SEWER FROM MANHOLE 320 TO MANHOLE 330
CLIENT: CITY OF WIGGINS

Tice Engineering was hired by the City of Wiggins to design and oversee construction of an emergency repair along Vine Street. The project required coordination with the City and residents in order to maintain existing services and limit the disruption to surrounding residences. The emergency repair included a survey of the existing system, design of a new 8” sewer line, emergency bidding services, inspection, and construction administration. Tice Engineering worked with the contractor and the City to ensure the project was completed as quickly and as efficiently as possible.

SCOPE OF WORK INCLUDED:
Survey of existing structures
Design of new sewer line
Bidding services for emergency repair
Construction administration
Construction inspection