2022
SEWER REHABILITATION - PHASE I
CLIENT: TOWN OF WALNUT GROVE
Tice Engineering was hired by the Town of Walnut Grove to plan, design and oversee construction of improvements for the existing sewer system. Tice Engineering kicked-off the project with the development and approval of a sewer facilities plan. Once the facility plan was in place, the Town was awarded a State Revolving Loan and Tice Engineering began design of the improvements. Design included the rehabilitation of more than 6,500 linear feet of sewer line. The existing sewer lines were old and required frequent repairs. The project required frequent coordination between regulatory agencies, the Owner, and the contractor.
SCOPE OF WORK INCLUDED:
Preparation of a facilities plan, including public hearing and approval
Survey of existing infrastructure
Prepared design drawings for proposed improvements
MDOT right-of-way permitting
Bidding services for sewer system improvements
Construction administration
Construction inspection